CMMC Guide · Assessments
CMMC Assessments: Types, Scoring, POA&Ms and Conditional Status
A CMMC assessment checks every requirement for your level and marks it Met, Not Met or Not Applicable. Meeting everything earns a Final status. At Levels 2 and 3, a score of at least 80% with only eligible items open earns a Conditional status, and those items must be closed within 180 days. Assessments are done by the company itself, by a C3PAO or by DCMA DIBCAC, depending on the contract.
What are the three types of CMMC assessment?
| Self-assessment | Certification assessment | Level 3 assessment | |
|---|---|---|---|
| Performed by | Your company | An authorized C3PAO | DCMA DIBCAC |
| Used for | Level 1 and Level 2 (Self) | Level 2 (C3PAO) | Level 3 (DIBCAC) |
| Repeated | Yearly at Level 1, every three years at Level 2 | Every three years | Every three years |
| Results entered | By you, in SPRS | By the C3PAO, through the government’s CMMC eMASS system | By DIBCAC, through CMMC eMASS |
The contract names the level and the assessment type. Third-party and DIBCAC requirements are paused for new contracts during the current suspension; see the current CMMC status.
How is each requirement judged?
Every requirement is broken into assessment objectives, and every objective must be satisfied for the requirement to be met.
- Met
- All objectives are satisfied, shown by evidence in final form. Drafts, working papers and unapproved policies do not count.
- Not Met
- At least one objective is not satisfied. The assessor records why.
- Not Applicable
- The requirement does not apply to your environment, for example public-access separation when you have no public systems. It counts the same as Met.
Two situations can still count as Met: a lasting exception described in your system security plan with its mitigations, and a temporary deficiency managed through an active operational plan of action.
What is the difference between Conditional and Final status?
Final status
All requirements are met, either on the first assessment or after a closeout assessment. Valid for one year at Level 1 and three years at Levels 2 and 3, as long as annual affirmations continue.
Conditional status
Some eligible requirements remain open on a POA&M. Valid for up to 180 days. A contract can be awarded with it, but if the items are not closed in time, the status expires.
Level 1 has no Conditional status: all 15 requirements must be met before the affirmation.
What can go on a CMMC POA&M?
A plan of action and milestones (POA&M) lists the requirements you have not yet met and how you will fix them. For a Conditional status, the rule limits what it may contain:
- Score: at least 80% of the maximum, which is 88 of 110 at Level 2.
- Point value: at Level 2, only 1-point requirements, plus encryption that is in place but not FIPS-validated.
- Never deferrable at Level 2: the system security plan, controls on external connections and on publicly posted information, and visitor escort, physical access logs and physical access device management.
- Never deferrable at Level 3: seven enhanced requirements, including the security operations center, the incident response team and supply chain risk planning.
Closing the items requires a closeout assessment of only the open requirements, done by the same type of assessor as the original, within 180 days of the Conditional status date.
What happens after the assessment?
Results are recorded
The result reaches SPRS, and each assessed information system receives a CMMC unique identifier (CMMC UID) to share with contracting officers.
A senior official affirms
Your Affirming Official affirms continuing compliance in SPRS after every assessment, after a POA&M closeout and once a year.
Evidence is kept
Keep the artifacts used as assessment evidence for six years from the CMMC status date.
Disputes are raised early
In a C3PAO or DIBCAC assessment, a Not Met finding can be re-evaluated with new evidence during the assessment and for 10 business days after it, before the findings report is delivered. DIBCAC results can be appealed within 21 days.
How self-assessment scores appear in SPRS: SPRS and the NIST SP 800-171 score
Questions about CMMC assessments
Can a contract be awarded with a Conditional CMMC status?
Yes, at Levels 2 and 3, as long as the Conditional status is current. At Level 1 a Final status is required.
What happens if we miss the 180-day POA&M deadline?
The Conditional status expires for that information system, and you no longer have a current CMMC status at that level until a new assessment succeeds.
Can the government check a self-assessment?
Yes. The Department can conduct its own DCMA DIBCAC assessment under its NIST SP 800-171 assessment clause (DFARS 252.240-7997, formerly 252.204-7020). If it finds the requirements were not met, the self-assessed status can be lost.
Know your result before the assessor does
Talk to a CMMCMARK specialist about a readiness review or a mock assessment for your level.
Prefer the phone? Call +1 (202) 867-8444.
Sources
- 32 CFR Part 170 (§ 170.15–170.18 assessments, § 170.21 POA&M, § 170.22 affirmation, § 170.24 scoring)
- DFARS Class Deviation 2026-O0025, Revision 3 (current status and award)
- DFARS 252.204-7020 (government access for DoD assessments; 252.240-7997 in new contracts)
